Past Construction Projects

Sn.
Projects Details
Completion Time
Dicipline Covered
Schedule
Actual
1
Contract no: 10327 Our Ref. :  SC-2043 Client :  KOC Maintenance and Engineering Services to Rosemount RS3 Control system installed in Gathering Centers of Kuwait Oil Co. (KOC).
24/02/2000
23/02/2006
Instrumentation
2
Maintenance and Engineering Services to Rosemount RS3 Control system installed in Gathering Centers of Kuwait Oil Co. (KOC).
24/02/2000
23/02/2006
Instrumentation
3
Project :  98-30047
SC-2037 Client   :  EQUATE Instrument & Electrical Maintenance works in EQUATE Poly-ethylene plant
2000-2004
2000-2004
Instrumentation
& Electrical
4
Projects  : 3260622 SC-2040A Client: PIC Maintenance of Instrumentation &Laboratory Equipments in Petrochemical Industries Co. (PIC) Plant at Shuaiba.
2003-2004
2003-2004
Instrumentation
5
Project :  MEW/AS/1814-97/98 SC-2036 Client : MEW (DEPS) Electrical Maintenance to Doha East Power Station of MEW, including overhaul of 3.3 KV to 11 KV Motors, Switchgear systems, MCC Operations & Fire Alarm Systems.
1998-2001
48 months
1998-2001
48 months
Electrical
6
Project :  CS-1111 / SH-91-43 / CT-4111 / CT-3520 / CT-2080 / CT-1410 SC-2002 Client    :  KNPC-S , Maintenance of Process Control Instrumentation which includes On-line Analysers as well as Laboratory Analytical Instruments at Shuaiba Refinery, KNPC

 

1982-2001
1982-2001
Instrumentation
7
Project: CB-0604 / CB-0957 / CB-1088
SC-2031Client    :  KNPC-MAB Maintenance of Laboratory Analyzers Preventive and Corrective Maintenance of 136 lab. Analyzers including Modifications & Training of KNPC Personnel in MAB Refinery
1996-2001
(108 months)
1996-2001
(108 months)
Instrumentation
8
Project : 97A018
SC-2029 Client    : KOC Maintenance and Engineering services of Rosemount RS-3 Distributed Control System at KOC Gathering Centre Nos.1,3,4,6,7,8,16,19 and 21and Training Simulation Unit at Production Operations Training Centre in Burgan.
1997-2001
(48 months)
1997-2001
(48 months)
Instrumentation
9
Project : CB/0690
SC-2032 Client   : KNPC-MAB Maintenance of Fire Alarm & Siren System in Mina Abdullah Refinery.
1997-2001
(48 months)
1997-2001
(48 months)
Electrical
10
Project : CB/0704
SC-2033 Client   : KNPC-MAB Maintenance of the Halon System at KNPC Mina Abdullah Refinery
1996-2000
39 months
1996-2000
39 months
Electrical
11
Project : 93G024
SC2027 Client   : KOC Mechanical Maintenance Services to Oil Production Facilities in all Operational Areas of Kuwait Oil Co.
1993-1997
(48 months)
1993-1997
(48 months)
Mecahnical
12
Project : 94A007 SC-2029 Client   : KOC Testing, Calibration/Repair of Specialised RS-3 Rosemount DCS for 13 systems and SCADA Telemetry Systems.
1994-1997
36 months
1994-1997
36 months
Instrumentation
13
Project : SC-2028C
Client   : MEW / KUWAIT CONTROLS Maintenance of Boiler Feed Water Pumps,F.D.Fans, all types of Valves from 2″ to 48″ in Mina Al-zour Power Station.
1994-1995
10 months
1994-1995
10 months
Mecahnical
Electrical
14
Project : MC/1099-94/95
SC-2030 Client   : MEW-SHUAIBA SOUTH POWER STATION Annual Maintenance of Instrument & Control System for Power and Distillation Plants.
1994-1995
(12 months)
1994-1995
(12 months)
Instrumentation
15
Project : RRP-SC-12 SC-2028 Client   : CPECC / KNPC-MAA Removal, Cleaning, Repairing, Reassembling and Testing of Control Valves, Motor Operated Valves, Pneumatic Valves, Gate Valves, Ball Valves, etc, in association with M.F.Kent, UK.

 

1994-1995
(10 months)
1994-1995
(10 months)
Mecahnical
Instrumentation
16
Project  : 242-91/92 Client    : MEW – AL-ZOUR Maintenance work of medium & low voltage switchgears &  motors of 3 power units.
1992-1993
(24 months)
1992-1993
(24 months)
Electrical
17
Project : CS-080 SC-2018 Client   : KNPC-S Service & Maintenance of theFire Alarm System at Shuaiba Refinery.

 

1990-1993
(36 months)
1990-1993
(36 months)
Electrical
18
Project :  FCC-102 SC-2024 Client   :  BECHTEL / KOC Repair and Maintenance of Fire Protection Equipments & Panels.
1990-1993
12 months
1990-1993
12 months
Electrical