SL.NO

PROJECT DETAILS

COMPLETION TIME

DISCIPLINE
 COVERED

COMPLETION TIME-SCHEDULE

COMPLETION TIME-ACTUAL

1

Contract No. :  10327
Our Ref. :  SC-2043
Client :  KOC

Maintenance and Engineering Services to Rosemount RS3 Control system installed in Gathering Centers of Kuwait Oil Co. (KOC).

24/02/2000

23/02/2006

Instrumentation

2

Contract No. :  98GO57
Our Ref. :  SC-2040
Client :  KOC

Maintenance services to Oil Production Facilities of Kuwait Oil Co. in North & West Kuwait areas in the Disciplines of Mechanical, Electrical & Instrumentation.

15/9/2003

15/09/2005

Mechanical, Electrical & Instrumentation

3

Project :  98-30047
              SC-2037
Client   :  EQUATE

Instrument & Electrical Maintenance works in EQUATE Poly-ethylene plant.

2000-2004

2000-2004

Instrumentation
& Electrical

4

Projects  : 3260622
                   SC-2040A
Client      : PIC

Maintenance of Instrumentation &Laboratory Equipments in Petrochemical Industries Co. (PIC) Plant at Shuaiba.

2003-2004

2003-2004

Instrumentation

5

Project :  MEW/AS/1814-97/98
              SC-2036
Client   :  MEW (DEPS)

Electrical Maintenance to Doha East Power Station of MEW, including overhaul of 3.3 KV to 11 KV Motors, Switchgear systems, MCC Operations & Fire Alarm Systems.

1998-2001
48 months

1998-2001
48 months

Electrical

6

Project :  CS-1111 / SH-91-43 / CT-4111 / CT-3520 / CT-2080 / CT-1410
               SC-2002
Client    :  KNPC-S

Maintenance of Process Control Instrumentation which includes On-line Analysers as well as Laboratory Analytical Instruments at Shuaiba Refinery, KNPC

1982-2001

1982-2001

Instrumentation

7

Project :   CB-0604 / CB-0957 / CB-1088
               SC-2031
Client    :  KNPC-MAB

Maintenance of Laboratory Analyzers Preventive and Corrective Maintenance of 136 lab. Analyzers including Modifications & Training of KNPC Personnel in MAB Refinery

1996-2001
(108 months)

1996-2001
(108 months)

Instrumentation

8

Project :  97A018
              SC-2029
Client    : KOC

Maintenance and Engineering services of Rosemount RS-3 Distributed Control System at KOC Gathering Centre Nos.1,3,4,6,7,8,16,19 and 21and Training Simulation Unit at Production Operations Training Centre in Burgan.

1997-2001
 (48 months)

1997-2001
 (48 months)

Instrumentation

9

Project : CB/0690
             SC-2032
Client   : KNPC-MAB

Maintenance of Fire Alarm & Siren System in Mina Abdullah Refinery.

1997-2001
(48 months)

1997-2001
(48 months)

Electrical

10

Project : CB/0704
             SC-2033
Client   : KNPC-MAB

Maintenance of the Halon System at KNPC Mina Abdullah Refinery

1996-2000
 39 months

1996-2000
 39 months

Electrical

11

Project : 93G024
             SC2027
Client   : KOC

Mechanical Maintenance Services to Oil Production Facilities in all Operational Areas of Kuwait Oil Co.

1993-1997
(48 months)

1993-1997
(48 months)

Mecahnical

12

Project : 94A007
             SC-2029
Client   : KOC

Testing, Calibration/Repair of Specialised RS-3 Rosemount DCS for 13 systems and SCADA Telemetry Systems.

1994-1997
36 months

1994-1997
36 months

Instrumentation

13

Project : SC-2028C
Client   : MEW / KUWAIT CONTROLS

Maintenance of Boiler Feed Water Pumps,F.D.Fans, all types of Valves from 2" to 48" in Mina Al-zour Power Station.

1994-1995
10 months

1994-1995
10 months

Mecahnical
Electrical

14

Project : MC/1099-94/95
             SC-2030
Client   : MEW-SHUAIBA SOUTH POWER STATION

Annual Maintenance of Instrument & Control System for Power and Distillation Plants.

1994-1995
(12 months)

1994-1995
(12 months)

Instrumentation

15

Project : RRP-SC-12
             SC-2028
Client   : CPECC / KNPC-MAA

Removal, Cleaning, Repairing, Reassembling and Testing of Control Valves, Motor Operated Valves, Pneumatic Valves, Gate Valves, Ball Valves, etc, in association with M.F.Kent, UK.

1994-1995
 (10 months)

1994-1995
 (10 months)

Mecahnical
Instrumentation

16

Project  : 242-91/92
Client    : MEW - AL-ZOUR

Maintenance work of medium & low voltage switchgears &  motors of 3 power units.

1992-1993
(24 months)

1992-1993
(24 months)

Electrical

17

Project : CS-080
              SC-2018
Client   : KNPC-S

Service & Maintenance of theFire Alarm System at Shuaiba Refinery.

1990-1993
(36 months)

1990-1993
(36 months)

Electrical

18

Project :  FCC-102
              SC-2024
Client   :  BECHTEL / KOC

Repair and Maintenance of Fire Protection Equipments & Panels.

1990-1993
12 months

1990-1993
12 months

Electrical

 



Home | Company Profile | Field of Activities | Departments | Subsidiaries | Projects | Services/ Facilities | Surveys
Sitemap | Careers | Contact Us


© Copyright 2006 ALMEER
Created and maintained by iPartner WSI
This site is optimized for Netscape 4.0 and Internet Explorer 5.0 or higher. Please download an updated version.